This portal is your centralized hub to access all project-related files, financial documents, updates, and important information—all in one secure place. All email correspondence can be viewed in the “conversation” link below, making it easier for you to stay informed and access everything you need anytime, anywhere. Using your project email below to reach us ensures that all communications reach all the important parties and are stored in your conversation space.

PROJECT EMAIL:

IMPORTANT LINKS

ACTION ITEMS

Let us know what research Justin will be providing within our Program Document, so we do not duplicate efforts :)

UPDATES

PROJECT TIMELINE

  • Typically $2,000 - $2,500

    This phase prevents any future challenges, laying the foundation for a successful project! During Pre-Design, the design team evaluates the site that has been identified for the project and will work with the owner to clarify what programs or uses are to be incorporated into the design. We also perform a comprehensive review of all applicable zoning ordinances or restrictions pertaining to the development of the project.

    Typical deliverables that are obtained or produced at the conclusion of pre-design include:

    • CAD (Critical Areas Designation) is coordinated with the county to provide information regarding sensitive areas and ensure a smoother permitting process.

    • Site Survey (Showing topographic information, existing structures, utilities, etc.) - coordinated with a survey company.

    • Geotechnical Report is coordinated when deemed necessary.

    • Zoning & Preliminary Building Code Analysis

    • Program & Project Scope Verification Document

  • Typically 25% of the design fee (est.$20,000 - $30,000)

    The Schematic Design is an early interpretation of the criteria agreed upon in the Design Program, with any modifications identified for review. We will meet to review this preliminary design and anticipate modifications to refine and get us closer to your vision. If the direction with discussion is acceptable, we will ask you to “sign off” on this phase, giving us permission to move forward to Design Development.

    In order to communicate our ideas, we’ll leverage whatever tools best serve that purpose. In SD, we typically present:

    • Inspiration imagery

    • Diagram(s)

    • Floor plan(s)

    • Perspective views or renderings

    • Study model

  • Typically 25% of the design fee (est.$20,000 - $30,000)

    Design Development is based on the Preliminary Design with any modifications and adjustments discussed applied. The documents provided in this phase will begin to reflect more accurately the conditions of the existing space and any adjustments needed to reach our agreed-upon design goal.

    We often build upon presentations from earlier phases but tools we typically use during DD to convey our ideas are:

    • Inspiration imagery

    • Diagrams

    • Perspective views or renderings

    • Floor plan(s)

    • Building elevations

    • Building sections

    • Material samples

    PERMIT DOCUMENTS

    Included in the DD and CD phase

    The timing of this drawing set will overlap the Design Development drawings and the Construction Documents. It is important to note that while we can use drawings from this set to develop the Construction Documents, this drawing set does not provide everything required to provide a build-out. This is a completely separate set of documents including drawings, forms, and energy calculations required by the county for permit application.

  • Typically 25% of the design fee (est.$20,000 - $30,000)

    Construction documents, including Drawings encompassing final design detail and, where appropriate, Specifications, and other information necessary for final implementation. The Construction Documents will be consistent with the Design Documents.

    Since we’ve made most of the “big” decisions, the media we leverage to communicate changes a bit but we continue to build upon the previous phases:

    • Floor plan(s)

    • Building elevations

    • Building sections

    • Ceiling plans

    • Detail drawings

    • Model(s)

    • Perspective views or renderings

  • Typically 20% of the design fee (est. $16,000 - $24,000)

    Once the Construction Documents have been approved, we will review with you a method of scheduling regular site visits for design observation and communication. Additional site visits requested by the owner and/or their contractor will be provided on availability.

    SCOPE OF WORK:

    • Scheduled milestone site visits

    • Advocating for you with the builder

    • Troubleshooting unforeseen conditions

    • Ensuring the execution of the design

    • Permit coordination

    • Quality control