Brooks Project Portal
This portal is your centralized hub to access all project-related files, financial documents, updates, and important information—all in one secure place. Going forward, this portal will replace our weekly email updates, making it easier for you to stay informed and access everything you need anytime, anywhere.
This message sets clear expectations and highlights the convenience of the portal for your clients.
Electrician:
Vashon Electric
(206) 463-4797
vashonelectric@gmail.com
Cabinet Shop:
BD Designs
(206) 463-6110
brad@bdavisdesigns.com
ACTION ITEMS
Nicole will reach out to schedule in intake meeting
UPDATES
PROJECT TIMELINE
-
For this focused project, we are wrapping Pre-Design and Schematic Design phases into Design Development.
Estimated: 16-20 hours
Design Development for this project will focus on creating cabinetry that complements your existing Phase 1 bedroom design. During this phase, we will:
Project setup and file organization
Site visit to measure, photograph, and document existing conditions
Review Phase 1 bedroom cabinetry and design to establish complementary direction
Develop cabinetry design for second bedroom
Create scaled drawings and elevations for cabinetry layout
Prepare material and finish specifications consistent with Phase 1
Two client presentation and review meetings
Revisions between presentations
Ongoing correspondence and coordination
In order to communicate our ideas, we'll leverage whatever tools best serve that purpose. For this project, we typically present:
Inspiration imagery
Scaled floor plan and elevations
Material samples and finish specifications
Cabinetry detail drawings
-
Estimated: 10-15 hours
Construction documents will provide the technical information needed for your cabinet fabricator to execute the design. This phase includes:
Prepare construction drawings for cabinet fabricator
Provide detailed specifications and finish selections
One round of revisions based on client feedback
Fabricator coordination meeting and handoff (drawings and specifications only)
Invoicing, retainer tracking, and ongoing correspondence
Since we've made most of the "big" decisions in Design Development, the Construction Documents will include:
Detailed cabinetry elevations
Construction specifications
Material and finish schedules
Hardware specifications
-
Estimated: 2-3 hours | $490 - $735
Optional consultation support is available if desired:
Available for questions from fabricator during fabrication/installation
One site visit to verify installation aligns with design intent
This phase is billed separately and only upon client request.